1 / 5
Concrete Formwork 1/2" Form Tie B Cone System
Standard Set Requirements:
A complete Form Tie System typically consists of:
| Component | B Form Tie | B Inner Unit | Plastic B Cone | Rib Washer | Hex Nut |
|---|---|---|---|---|---|
| Diameter | 1/2" | B9, 3/8" | 3/8" | 2.5mm/3.0mm | 1/2" |
| Size | 180-250mm | Customizable | B9*12/16/24 | Various | Standard |
| Weight | 145g - 197g | Varies | 35g - 45g | Varies | 20.5g |



The D Form Tie System is widely used in concrete construction for assembling temporary formwork systems.
| Name | Length | Size | Packaging |
|---|---|---|---|
| D Form Tie | 150mm - 250mm | 1/2" | Bundle + Pallet |
| D Cone | 40mm / 50mm | 1/2" | Carton + Pallet |
| Inner Unit | Based on Wall Thickness | 1/2" | Bundle + Pallet |
| 3 Shape Washer | 115mm | - | Bag + Pallet |


1. Quality Control: Strict three-level testing (production line, warehousing, and pre-loading).
2. Timeliness: 24-hour online support for consulting and quotations.
3. Veracity: Ensuring precise tolerance ranges based on customer standards.
4. Integrity: Active cooperation to solve any quality concerns responsibly.